FESCO New Connection 2025 – Full Guide

Getting a FESCO New Connection from the Faisalabad Electric Supply Company (FESCO) is a simple process if you follow the required steps. This guide will walk you through the entire process, from submitting your application to getting the electricity connection installed at your property.

FESCO New Connection
FESCO New Connection
StepsDetails
Application SubmissionSubmit the application form with the documents
Fee PaymentPay the required fees at designated banks
Site SurveyThe FESCO team visits your location for an inspection
Connection InstallationAfter approval, FESCO installs the connection

Submit the Application Form

The first step in getting a FESCO New Connection is to submit an application form. You can get this form from your nearest FESCO office or download it from the official FESCO website. Fill out the form carefully, providing all the necessary details like your name, address, and the type of connection you need (residential, commercial, etc.).

Attach Required Documents

Along with the application form, you need to attach certain documents. These include:

  • Copy of CNIC: Your Computerized National Identity Card.
  • Proof of Ownership: A copy of the property documents to prove ownership.
  • No Objection Certificate (NOC): If the property is rented, you need an NOC from the owner.
  • WAPDA’s Demand Notice: The demand notice from the Water and Power Development Authority (WAPDA).

Make sure all documents are clear and valid to avoid any delays in processing your application.

Related Also: How to Check FESCO Bill Online 2025

Pay the Fee

Once your application form and documents are ready, you need to pay the required connection fee. FESCO has designated specific banks where this payment can be made. The amount you need to pay depends on the type of connection you are applying for. Keep the receipt as proof of payment, as it will be required later.

Site Survey by FESCO

After submitting your application and paying the fee, FESCO will send a team to your location for a site survey. This survey is to check the feasibility of providing a new electricity connection to your property. The team will inspect the area and assess the work required to install the connection.

  • Inspection of Wiring: Ensure the internal wiring of your property is up to standard.
  • Pole Placement: The team will decide where to place the electricity pole if needed.
  • Safety Measures: FESCO will ensure all safety measures are in place before proceeding.

Approval and Installation

If everything is in order after the site survey, FESCO will approve your application. After approval, the connection installation process begins. The FESCO team will install the necessary equipment, such as the electricity meter, and connect your property to the power grid. This process may take a few days depending on the workload and the complexity of the installation.

Conclusion

Getting a FESCO New Connection involves several steps, but by following the guidelines provided, you can ensure a smooth and hassle-free process. From submitting your application to the final installation, it’s important to provide all the required documents, pay the fees, and cooperate with the FESCO team during the site survey. Once your connection is installed, you can enjoy a reliable electricity supply for your property.

FAQs

What documents are needed to apply for a FESCO New Connection?

You need a copy of your CNIC, proof of property ownership, an NOC if the property is rented, and a demand notice from WAPDA.

How do I pay the connection fee?

What happens during the site survey?

How long does it take to get the electricity connection installed?